How to maintain the calorimeter

With the development of all walks of life, the calorimeter has been playing an increasingly important role in the wood, petroleum, coal and other industries. It can accurately measure the calorific value of burning materials. It is an important contribution to the development of wood, petroleum, coal and other industries. With such sophisticated equipment, how should we maintain and maintain the calorimeter? I will explain it to you now:

Tempering barrel maintenance and maintenance (1) Add 300ml purified water to the inner barrel every week;

(2) It is forbidden to bring foreign matter or impurities into the inner barrel so as not to pollute the water quality and block the pipeline;

(3) After the experiment is completed, the constant temperature barrel lid should be opened to avoid corrosion of the instrument components;

(4) Replace the outer tub water at least once a year;

(5) Abnormal conditions of the instrument can be diagnosed using an expert diagnostic system.

Maintenance and Maintenance of Oxygen Bombs (1) Prior to the formal experiment every day, be sure to fill the empty oxygen bomb with enough gas and submerge it in water for several minutes to observe whether the sealing performance of the oxygen bomb is good and to ensure the reliability of the test results.

(2) After each experiment is completed, the parts of the oxygen bomb must be rinsed with distilled water and wiped with a special towel;

(3) If a leak of oxygen bomb is found, replace the spare seal; otherwise, it cannot be used;

(4) If it is found that the oxygen bomb thread slides, the use of the oxygen bomb is prohibited;

(5) Oxygen bombs should be inspected periodically and at least once a year for hydrostatic testing (which can be sent to Sande for testing);

(6) After use, it should be cleaned. It is best to heat on the electric oven for 3~5 minutes.

(7) Care must be taken when taking oxygen bombs from the inner barrel to prevent damage to the inner barrel due to impact or falling.

Automatic oxygenator maintenance and maintenance (1) The trial oxygen must meet the requirements of GB213-96, and the use of electrolytic oxygen is prohibited. Oxygen cylinders should be placed in a place that complies with safety regulations;

(2) The oxygenator should be placed on a stable work surface;

(3) Oxygenators (including oxygenating catheters and pressure reducing valves) must not be in contact with various oils and fats;

(4) The oxygen conduit on the oxygenator should avoid bending and twisting;

(5) There is no open flame around the oxygenator;

(6) If the oxygen pressure of the oxygen cylinder is less than 5 MPa, replace it with new oxygen. If the oxygen pressure in the oxygen bomb exceeds 3 MPa, the oxygen in the oxygen bomb should be released, and the oxygen bomb reloaded and recharged.

200MW Power Plant:

Our company provide professional technical service for 200Mw Power Plant, replacement of Voith Coupling, Geared Hydraulic couplings overhaul, replacement of booster pump. 

Also we help client to make a general comprehensive solution proposal of energy saving transformation for boiler feed water pump in thermal power plant. 

From 2012, we have finished Energy Saving Project for more than 20 thermal power plants, and the electricity saving ratio is about 23%.

Please contact us directly if you are interested in this project.

R15k551 1 1

1 4

200MW Power Plant

200Mw Power Plant,Micro 200Mw Power Plant,200Mw Hydro Power Plant,Mini 200Mw Power Plant

Shenyang German Machine Hydraulic Transmission Machinery Co., Ltd. , http://www.hcouplingc.com

Posted on