Hydraulic filling method

The cutting work is mainly to pull the bottom work. Pulling the bottom is done in two steps. First, in the short patio excavated in the bottom column, dig the bottom roadway 5 meters above the floor of the tunnel, and then take the bottom road as the direction stone, and pull the bottom of the mine all open (expanded to the mine) Body boundary). Form a 2 m pull-out space and then pick it up. The height of the top is 2.5 to 3.0 meters. At this point, all the ore that has fallen out is transported out (released from the well-discharged well that has been dug in the bottom column). Finally, a 4.5 to 5 meter bottoming space is formed. After the entire bottoming space is formed, the reinforced concrete floor is built, and the thickness of the bottom plate is 0.8 to 1.2 meters. At this point, the cutting studio is completed and can be officially and resumed.

Cashew Nuts Shelling Machine

1. We are manufacturer of the Cashew Nuts Shelling Machine , Cashew Nuts Dehulling Machine , Hulling Machine , Shelling Machine.

Cashew Nuts Shelling Machine


2.Technical parameter

Name Cashew Nuts Shelling Machine
Model HLD-TK
Power 0.55-1.55kw
Voltage
380V/220V
Capacity 50-500kg/h
Size 1600x1500x1600(mm)
Brand HELIDA
Material
Stainless steel
Warranty
two years

Cashew Nuts Shelling MachineCashew Shelling MachineCashew Hulling MachineNuts Shelling MachineNuts Hulling Machine

Cashew Nuts Shelling Machine

Cashew Nuts Shelling Machine,Cashew Nuts Hulling Machine,Nuts Shelling Machine,Nuts Hulling Machine

Hebei HELIDA Grain Selecting Machinery Technology Co., Ltd. , https://www.grainseedscleaner.com

Posted on