Peaceful City's Xueliang Project's first knowledge of tapered poles

From the original electronics*, to the safe city of Skynet in the previous two years, and to the present smart city’s Xueliang project, the security technology prevention system and project have occupied an increasing proportion in the entire social security system. Rely on these technical precautions for our convenience.
The development of smart technologies cannot be supported by some basic products. Now, let's talk about these special highlights, things that aren't possible: monitoring poles. As the saying goes, the basic things are the most crucial.
We also learned about some of the knowledge of Skynet’s safe city poles in the past: Technical details and installation requirements of the monitoring poles in safe cities. Many people feel that they are not satisfied. They always feel that they are standard knowledge and common requirements. Not practical. Ever since, at the request of the majority of friends, we have compiled some of our common electronic * octagonal data to share with everyone.


Electronic* monitor pole composition:
The security monitoring pole serves as the main body for carrying various types of cameras, alarms, fill lights and other components, and is mainly composed of poles, connecting flanges, shape arms, mounting flanges and embedded steel structures.
Video monitor pole common appearance form: cone and two straight rods
We often use Skynet's electronic poles, which are generally tapered pipe poles. The tapered pipe poles are divided into: prismatic and conical.
Taper rods have the following advantages over two-stage column stems:
The processing technology is simple: the taper pole directly adopts the steel plate to curl and then is produced by the welding process. There is almost no requirement for welding accuracy, and the welding can be beautiful and reliable. At the same time, the weld seam is not directly subjected to force, and the durability and reliability are relatively high. The two-column pipe stem needs to be welded with an adapter between two straight pipes of different thicknesses, which requires high welding process. If the welding accuracy is not high, the problems of inconsistent and inconsistent axial directions of the upper and lower straight pipes tend to occur. In addition, the weld directly withstands the gravity effect of the upper straight pipe, and the welding quality is not high enough to cause hidden troubles.
High wind resistance: Cone rods adopt an integrated process, and the forces in the axial and transverse directions are relatively uniform. The poles of two-stage columns need at least three parts to be welded. The overall strength depends to a large extent on the welding. Quality, and the force is not uniform so the strength is not as good as the former.
Appearance is more beautiful: the finer and thicker shape is more in line with the aesthetics of most people. Straightening the tube too high makes it easy for people to feel top-heavy and unstable, resulting in an unsafe illusion.
Monitoring pole construction and installation:
Having said the components, let's talk about the installation of monitoring poles.
The main construction steps are divided into: excavation pits, preset cages, concrete pouring, poles.
The cage should take fixed measures before pouring the concrete to ensure that the reinforced roof plane of the reinforced roof is measured horizontally in the two directions of the base roof; the concrete pouring of the monitoring base embedded part must be compacted to prevent concrete There is an empty drum.
The bolts fixing the pole to the ground cage shall not be less than M20 in general, and the height of the base surface of the cage protruding from the threaded part shall be greater than 70mm. All the nuts, gaskets and other structural parts used shall be national standard products.
The height of the monitor pole of the safe city is roughly 5-6 meters. During the installation process, the overall verticality of the installation is mainly noticed so as not to affect the use and aesthetics, and the verticality of the surrounding building body can be combined with the naked eye.
In fact, the deviation of the verticality of the vertical pole is approximately 1% visually almost impossible to detect, and when the deviation reaches 2%, the human eye can easily notice that the pole has tilt.
The level of the upper flange and crossbar of the cone pole is critical
In fact, it is necessary to ensure that the poles are erected and erected, and the horizontal poles are perpendicular to the horizontal plane. The most important point is to ensure that the pole mounting flange is perpendicular to the main body of the pole before leaving the pole.
Therefore, a reliable pole processing plant is critical. The verticality of the mounting flange of the pole and the main body of the rod largely depends on the welding process between the two. Therefore, it is necessary to conduct a certain inspection on the enterprises that produce poles in actual projects.

we produce a huge range of products and are continually expanding our services to customers. This area shows images of some of our recent work to show the scope available to our clients. This is just a sample of what we can do, so please contact us for more information.

Material:Grey iron

Casting weight range:1-500kgs

Process:casting+CNC Machining

Application:Machinery

Market:Europe,America

 

Baoding Henglian can supply the following castings

1:grey iron castings:DIN1691-85, GG15,GG20,GG25, GG30,GG35,

2,Ductile iron castings:ASTM A536-84,GRAND 60-40-18,65-45-12,80-55-06,100-70-03

3,Malleable iron castings:DIN1692-82 GTS-35-10

4,carbon steel and alloy steel castings

5,brass castings,bronze castings and aluminum castings

sand casting

Sand Casting

Sand Casting Foundry,Sand Casting,Ductile Iron Casting,Steel Casting

Baoding Henglian Mechanical Co.,Ltd , https://www.hengliancasting.com

Posted on