Technical delivery - installation of aprons and covers

Installation of apron board and cover

First, equipment material requirements

1The apron plate, inner cover and outer cover should be intact, the surface is smooth, no scratches, and the quantity is complete.

2 self-tapping countersunk screws, countersunk head screws.

Second, the main equipment

The main equipment includes: hand drill, tap, screwdriver, ruler, open end wrench, drill bit, feeler gauge, magnetic line pendant, ratchet wrench, rubber hammer and so on.

Third, the operating conditions

1 The truss and armrest system are installed, and the remaining six steps are not installed.

2 Each installed component is cleaned.

3 The site should have sufficient lighting and be powered separately with a safe voltage of 36V.

Fourth, the operation process

(1) Process flow:

Technical basis - installation of apron board and cover

(2) Installing the skirt:

1 When installing the skirt, first install the upper and lower ends, and then install the middle section.

2 The clamp on the back of the skirt is snapped into the apron angle steel, and the skirt and the angle steel surface are firmly attached, and there is no looseness.

3 When assembling the skirt, the joints should be tight and flat, the skirt and the angle steel surface should be straight, and there should be no unevenness and bending. When loading the skirt, use a rubber hammer to knock the skirt back.

4 adjust the gap between the skirt and the steps:

(1) The installation and commissioning standards for the left and right dimensions of the side of the step (stop state) and the surface of the apron are as follows:

The unilateral gap is 1 to 4 mm, and the sum of the gaps on both sides is not more than 7 mm.

(2) Within the size range specified by the standard, fine-tune the apron installation size so that when the step is lifted, the gap between the step and the skirt should not exceed the standard part, and the step and the skirt are not guaranteed. Causes contact and friction.

(3) The adjustment can be made by moving the apron angle steel during commissioning.

(3) Installing the inner and outer covers

1Stainless steel cover is the decorative part of the escalator. It should be especially careful when installing. The joints should be tight and flat, and there should be no bumps and bends.

2 First install the inner cover to the strip, and find the position, drill the tapping hole on the skirt to fix the inner and outer covers on the skirt and seal.

3 After installing the handrail at the corner, first install the inner and outer covers of the corner cover and the curved part, and then install the middle cover to ensure that the horizontal angle of the inner cover is not less than 25°.

Five, quality standards

(1) Main control project:

1 The horizontal clearance between the apron board and any side of the step should not be greater than 4mm, and the sum of the gaps on both sides should not be greater than 7mm.

2 The bosses at the joints of the inner cover, outer cover and apron plate should not exceed 0.5mm.

Inspection method: ruler inspection.

(2) General items:

1Apron board and cover should be installed firmly and evenly, the joints should be tight, there should be no bumps and bends, and they should be butt joints.

2 The most unfavorable part of the apron plate is perpendicularly applied with a force of 1500 N on an area of ​​2500 mm 2 , and the depression should not be greater than 4 mm, and should not cause permanent deformation.

Inspection method: observation inspection.

Construction safety and finished product protection

1 When the building has other specialties at the same time, the personnel should wear a safety helmet.

2 When assembling the outer cover, a seat belt must be used to prevent falling.

3 The skirt and cover plate should be handled gently during transportation, and it should not be smashed. It is strictly forbidden to hit with a hammer.

4 After installation, do not remove the protective film before use for official use to prevent scratches.

Seven, should pay attention to the problem

1 Before assembling the skirt and cover, keep the lower part of the handrail system and the inside of the escalator clean and hygienic.

2 When assembling the skirt and cover, when the gap between the skirt, the cover and other parts is not suitable, it is strictly forbidden to hit with a hammer. The rubber hammer should be used. If the tapping still cannot meet the requirements, other methods such as adding gaskets should be adopted. Adjustment.

Product name: Stainless Steel Sanitary Cleaning Balls
1)Technology: Forged
2)Size range: DN10-100MM and 1/2" - 2.1/2"
3)Material: Stainless Steel 304, 316L,
4)Seal(Gasket): EPDM, SILICON, VITON, PTFE,
5)Type of ends available: Clamp end, Weld end, Male end, Female end, and bolted
6)Standard: DIN/SMS/ISO/3A/IDF
Application: Chemical Processing, Water & Wastewater, Landfills, Irrigation, dairy, beverage, meat processing, Mining, vacuum processing, pharmaceutical, chemical, and many other industries.
This cleaning ball is used for cleaning the tank, Requiring more detail information or catalog pls don't hesitate to contact us. For all our products, we can also produce according to ur drawing if ur Specification is out of our standard.

Sanitary Cleaning Ball
 

FAQ:
1.Are you a trader or manufactor?
 We are a manufactor (Own Forging workshop and CNC machining workshop )
 
2.Can your products reach to FDA , CE and 3A requirements?
Yes, all of our material can reach to the requirements of FDA, ISO and 3A Certificate).


3.We can supply:
 Sanitary Butterfly Valve, Sanitary Check Valve and Diaphragm Valves, as well as Various Tank Accessories:  Sight Glass, Strainers/Filter, Cleaning Ball, And other Pipe Fittings, (Pipe Unions: SMS, DIN, IDF, RJT, 3A,DS; Fittings: Ferrule,Elbow, Tee, Reducer and all other Non-standrad fittings), each products are tested well by our strictly Quality Control System, and we also have excellent service to support you and promote your business.
 
4.Lead Time:
For large quantity, as usual, it can be sent out within 20-40 days.
Small parcel will be dispatched by DHL, FedEx, UPS OR TNT Courier.
Big cargo will be delivered by Air freight or By Sea.
 
5.Our Service:
About payment:
Payment methods: L/C, T/ T, Paypal,Western Union


6.About samples:
We can provide samples production and service. Usually 2 to 5 days, the sample can be sent to your hands. We will choose the shipping way as you required: By sea, by air or by express. Any question about samples, please contact us.


7.For OEM products:
We will finish the production within 20-40 days after payment has been confirmed.
About delivery and shipping:
We will choose the delivery way as you required: By sea, by air, by express ect. Save your cost is our mission.


8.Warranty:
Any question or problem will be respond within 12 hours.


9.Lifetime service:
Any problem happened to our product, we will do our best to help client to solve it, spare parts will be half price in lifetime.


10.Problem solve:
If you can't solve the problem in your local, please delivery the product to us, we will repair it and then back to you.


11.Quality control:
All the products are calibrated with real working condition, and tested before shipping as qualified product.


12.Purpose:Attitude is everything.

Sanitary Cleaning Ball

Washing Ball,Spray Ball,Clean Ball,Spray Balls Stainless Steel

Wenzhou Qili Fluid Equipment Co., Ltd. , https://www.qlssvalve.com

Posted on