Equipment load operation rate of main workshop in Wuchuan Mercury Mine Concentrator

Wuchuan mercury ore dressing plant load operation of main plant equipment

Workshop name

Comprehensive production capacity (rated)

Load factor%

Operating rate%

First, the crushing workshop

400t/d

50

80

Medium crusher

Fine crusher

400t/d

50

80

Second, grinding and floating workshop

240t/d

84

Grinding machine

0.92t/m 3 ·h (calculated by newborn -200 mesh)

89

84

Flotation machine

0.23m 3 /t·d

82

84

Third, dehydration workshop

3.2 (concentrate) t / d

75

Filter

0.5t/m 2 t·d

50

75

Dryer

4.8t/d

67

75

Leveling Machine

Leveling Machine, Roller Leveling Machine,High Speed Leveling Line,Steel Coil Tension Leveling

Wuxi Wushi Machinery Factory , https://www.cnrollmill.com

Posted on