Operational regulations for safe production of tailings pond return pump

1. Before starting the pump, check whether the lubrication of each part is good, whether the screw is loose, the belt is tight, whether there is any debris in the pump pool, whether the pipeline is unblocked, whether the disc is light, whether there is friction and impact sound in the pump, and Is the belt cover tightly fastened?
2. Before the pump is started, check the water seal packing condition and find that the water leakage should adjust the buckle or replace the packing.
3. Do not use wet hands when starting, apply one-hand side operation.
4. After the pump is started, the amount of added water should be adjusted reasonably according to the liquid level to ensure the liquid level is stable and prevent the pump from breathing.
5. Always check the motor, bearing temperature and lubrication of each part during operation. Do not touch the rotating part, and do not remove the safety device at will.
6. Use the return water pump strictly according to the operating procedures, and regularly replenish the return water, not only to ensure the process water, but also to prevent the return pool from overflowing.
7, parking in winter, no water in the pump and pipeline to avoid freezing.
8. When the temporary power failure or accident parking, immediately pull down the start switch and close the sewage discharge valve.

GYQ Drilling Rig

GYQ drilling rig is an upgraded and improved product of GXYdrilling rig. It mainly adds the winch detachment
function structure, thereby extending the service life of the hoist. This drilling rig is a vertical transmission rotary drilling
rig with mechanical transmission and hydraulic feed. It can be applied to engineering geological survey, general survey of
solid deposits, grouting of dams and ventilation and drainage of tunnels. Depending on the drilling formation, cemented
carbide, steel grit, and auger types can be used for drilling.

Main Feature:
The structure of this rig has the following features:
1. A more reasonable speed range is selected. There are eight speed levels, centralized speed change, self-locking with
each other, large low-speed torque, and a wide range of use.
2. The drilling rig has two speeds of reversing speed, which is convenient for handling faults safely.
3. The self-centering hydraulic chuck is adopted, which is convenient for clamping and loosening the drill pipe. And has
a hydraulic feed mechanism, strong pressure and lifting capacity.
4. Equipped with sufficient instruments, it is helpful to grasp the situation in the hole, fewer operating handles, more
reasonable layout, flexible and reliable operation.
5. The two-plate normally closed friction clutch is adopted, which is flexible to open and close, and easy to adjust and use.
6. The rig is light in weight, compact in structure, easy to disassemble, and suitable for drilling work in hills or mountains.
7. The hoist has a detachment function. Increased the service life of the hoist.


Gyq Drilling Rig,Gyq Survey Machine,Gyq Survey Rig,Spindle Core Drilling Rigs

JIANGSU XI TEC ENVIRONMENTAL&DRILLING EQUIPMENT COMPANY CO.LTD , https://www.xitecdrilling.com